Terasaki TRPMSL Meter Supply Loom, for Resilience Plus Panelboards
- Brand:
- Terasaki
- Part number:
- TRPMSL
Meter supply loom for outgoing metering on Resilience Plus panel boards, one per metered side cableway, used with the first meter in that cableway. Terasaki part number TRPMSL.
- Meter supply loom
- One per metered side cableway
- For Resilience Plus outgoing metering
- Works with TRSSMP1 and TRSSMMP1 meters
Available to order
UK delivery £9.95 ex VAT, free on orders of £100 ex VAT or more; usually 3-5 working days.
Minimum order £50 ex VAT. All prices exclude VAT, which is added at checkout.
Project quantities or a lead time to check? Request a quote
Specifications
Electrical
| MID approved | No |
|---|
Fit
| Panelboard range | Resilience PlusWhat does this mean?Modular: a separate incomer housing beside the panel board, with add-on enclosures and cableways. 400 A or 800 A busbars, 6 to 18 outgoing ways, outgoing MCCBs up to 250 A (400 A on the twin board), Form 3a or 3b Type 2, doors optional. |
|---|
Identification
| Brand | Terasaki |
|---|---|
| Part number | TRPMSL |
| Range | Terasaki Resilience |
| Type | Meter supply loom |
More technical data
| Terasaki part number | TRPMSL |
|---|---|
| Product | meter supply loom |
| Quantity | one per metered side cableway |
| Range | Resilience Plus outgoing metering |
| Used with | TRSSMP1 or TRSSMMP1 meters |
Product details
TRPMSL is the meter supply loom for outgoing metering on Resilience Plus panel boards. Terasaki's outgoing meter selection chart calls for one loom per side cableway, ordered with the first outgoing meter in the left-hand or right-hand cableway.
Key features
- Meter supply loom for Resilience Plus outgoing meters
- One per metered cableway, left-hand or right-hand
- Goes with the first meter in the cableway; each further meter there takes a TRMVSC03 cable, per Terasaki's chart
- For the single-channel panel meters TRSSMP1 and TRSSMMP1
Typical applications
Any Resilience Plus board with outgoing meters: one loom for the left-hand cableway if meters are fitted there, and a second if the right-hand cableway carries meters too. Typical installations meter selected outgoing ways for floors, plant or tenant areas, with up to nine meters in an 8-module cableway.
For Resilience Plus side cableways (TRPCM2 to TRPCM8) fitted with the matching cableway metering door kit (TRPCMD2 to TRPCMD8); a cableway and its door kit are both required for outgoing meters. Our Panel Builder adds one loom for each side of the board that has metered ways.
Add it to your cart, or ask us to check the metering parts for your board.

